Study by TERA on the future of interconnection charging methods
Study by TERA on the future of interconnection charging methods
The European Commission has published a report by TERA Consultants on the future of interconnection charging methods.
The objective of this study is to investigate whether there is a case to move beyond an improved “Calling Party Network Pays” (CPNP) regime to a “Bill And Keep” (BAK) interconnection charging scheme given technological changes and market developments.